Infrastructure - Services Buildings

Energy Centre 

The Energy Centre supplies the heating and cooling systems for the entire Campus. There are currently two large coolers ( 1000KW each) and two boilers ( 1800 kw each). Eleven additional coolers and six boilers are slated for future installation.
 

Sewage Treatment Plant
All sewage from the Campus buildings is channeled through a central sewage system to the Sewage Treatment Plant, where it is processed with a third-degree treatment. The water produced is used for irrigation of the University grounds.
 

EAC Primary Substation
The EAC (Electricity Authority of Cyprus) Primary Substation supplies electricity to the entire Campus. It has a capacity of 8MVA.