
{"id":3512,"date":"2000-11-01T12:23:39","date_gmt":"2000-11-01T10:23:39","guid":{"rendered":"https:\/\/www.ucy.ac.cy\/ts\/?p=3512"},"modified":"2026-02-16T12:41:36","modified_gmt":"2026-02-16T10:41:36","slug":"student-residences-phase-1a","status":"publish","type":"post","link":"https:\/\/www.ucy.ac.cy\/ts\/student-residences-phase-1a\/?lang=en","title":{"rendered":"Student Residences &#8211; Phase 1a"},"content":{"rendered":"<p><strong>Planning \/ Design<\/strong><\/p>\n<p>The planning and design of the Student Residences \u2013 Phase A (SRA) were the subject of the 2nd Architectural Design Competition, organised by the Campus Development Office within the framework of the Campus Master Plan. The Competition procedure was completed in October 1998.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Design Team<\/strong><\/p>\n<p>The 1st prize of the Competition was awarded to Architects\u2019 team Chrysanthou &amp; Papachristou (C. Chrysanthou and Associates)<\/p>\n<p>The team established for the study and supervision of the Project consists of the following:<\/p>\n<table width=\"500\">\n<tbody>\n<tr>\n<td width=\"129\">Architects:<\/td>\n<td colspan=\"2\" width=\"365\">Chrysanthou &amp; Papachristou (Chrysanthos Chrysanthou &amp; Eracles Papachristou)<\/td>\n<\/tr>\n<tr>\n<td width=\"129\"><\/td>\n<td colspan=\"2\" width=\"365\"><\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Civil Enginner:<\/td>\n<td colspan=\"2\" width=\"365\">Loizos Hadjigeorgiou<\/td>\n<\/tr>\n<tr>\n<td width=\"129\"><\/td>\n<td colspan=\"2\" width=\"365\"><\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Electrical Engineer:<\/td>\n<td colspan=\"2\" width=\"365\">Mitsides Samuel and Associates<\/td>\n<\/tr>\n<tr>\n<td width=\"129\"><\/td>\n<td colspan=\"2\" width=\"365\"><\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Mechanical Engineer:<\/td>\n<td colspan=\"2\" width=\"365\">Yiannos Zembylas and Associates<\/td>\n<\/tr>\n<tr>\n<td width=\"129\"><\/td>\n<td colspan=\"2\" width=\"365\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"148\">Quantity Surveyors:<\/td>\n<td width=\"346\">Ilikkos M. Kyriakou<\/td>\n<\/tr>\n<tr>\n<td width=\"132\"><\/td>\n<td width=\"19\"><\/td>\n<td width=\"349\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong><br \/>\nProject Description \/ Uses<br \/>\n<\/strong><br \/>\nThe Building Facilities consist of a complex of 14 independent buildings.<\/p>\n<p>The complex includes 208 individual rooms in three basic types, as well as common and other functional support areas (living room, laundry, post office, tenant service office, etc.) distributed in 12 and 2 separate buildings, respectively.<\/p>\n<p><u>Unit\/room types:<\/u><\/p>\n<p><u>Type <\/u><u>A (48 <\/u><u>rooms)<\/u><br \/>\nEach unit\/room has a bathroom for exclusive use. For every 12 units there is a shared living room with a kitchen.<\/p>\n<p><u>Type <\/u><u>B (144 <\/u><u>rooms)<\/u><br \/>\nEach unit\/room has a sink for exclusive use. For every 8 units there are shared bathroom facilities and a shared living room with a kitchen.<\/p>\n<p><u>Types <\/u><u>C&amp;<\/u><u>D (16 <\/u><u>apartment-<\/u><u>type <\/u><u>rooms)<\/u><br \/>\nEvery 2 units\/rooms have a shared bathroom and kitchen. 4 of the total 16 rooms (2 ground floor apartments) are suitably equipped for use by persons with disabilities.<\/p>\n<p>The rooms are arranged in 3 different building clusters:<\/p>\n<p>The 1st cluster with 4 buildings includes the type A rooms.<\/p>\n<p>The 2nd cluster with 5 buildings includes the type B rooms.<\/p>\n<p>The 3rd cluster with 3 buildings includes the type C rooms.<\/p>\n<p>The organic connection of the two clusters (1st &amp; 2nd), both between themselves and with the individual buildings, is achieved through external corridors\/pathways and circulation ramps. These routes, constitute a dominant characteristic element of the architectural expression of the project.<\/p>\n<p>The development is complemented by landscaped outdoor areas centred on the central square.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Building <\/strong><strong>Area<\/strong><\/p>\n<p>The total area of \u200b\u200bthe Project is 12358 square metres as analysed below:<\/p>\n<table width=\"500\">\n<tbody>\n<tr>\n<td>Building Name<\/td>\n<td width=\"96\">Net Building\u00b9 Area * (sq.m.)<\/td>\n<td>Gross Building\u00b2 Area (sq.m.)<\/td>\n<td>Semi open-air\u00b3 spaces Area (sq.m.)<\/td>\n<td>Total Area<a name=\"_ftnref1\"><\/a><a href=\"https:\/\/www.ucy.ac.cy\/ts\/athletic-centre-sports-hall-and-sports-fields\/?lang=en\">[4]<\/a> (sq.m.)<\/td>\n<\/tr>\n<tr>\n<td>SRA 00<\/td>\n<td>\u2013<\/td>\n<td>119<\/td>\n<td>4.892<\/td>\n<td>5.011<\/td>\n<\/tr>\n<tr>\n<td>SRA 01<\/td>\n<td>469<\/td>\n<td>945<\/td>\n<td>159<\/td>\n<td>1.104<\/td>\n<\/tr>\n<tr>\n<td>SRA 02<\/td>\n<td>388<\/td>\n<td>649<\/td>\n<td>87<\/td>\n<td>736<\/td>\n<\/tr>\n<tr>\n<td>SRA 03<\/td>\n<td>399<\/td>\n<td>660<\/td>\n<td>88<\/td>\n<td>748<\/td>\n<\/tr>\n<tr>\n<td>SRA 04<\/td>\n<td>399<\/td>\n<td>660<\/td>\n<td>88<\/td>\n<td>748<\/td>\n<\/tr>\n<tr>\n<td>SRA 05<\/td>\n<td>635<\/td>\n<td>1.064<\/td>\n<td>193<\/td>\n<td>1.257<\/td>\n<\/tr>\n<tr>\n<td>SRA 06<\/td>\n<td>196<\/td>\n<td>377<\/td>\n<td>51<\/td>\n<td>428<\/td>\n<\/tr>\n<tr>\n<td>SRA 07<\/td>\n<td>212<\/td>\n<td>396<\/td>\n<td>51<\/td>\n<td>447<\/td>\n<\/tr>\n<tr>\n<td>SRA 08<\/td>\n<td>228<\/td>\n<td>416<\/td>\n<td>52<\/td>\n<td>468<\/td>\n<\/tr>\n<tr>\n<td>SRA 09<\/td>\n<td>258<\/td>\n<td>429<\/td>\n<td>55<\/td>\n<td>484<\/td>\n<\/tr>\n<tr>\n<td>SRA 10<\/td>\n<td>100<\/td>\n<td>156<\/td>\n<td>14<\/td>\n<td>170<\/td>\n<\/tr>\n<tr>\n<td>SRA 11<\/td>\n<td>141<\/td>\n<td>211<\/td>\n<td>14<\/td>\n<td>225<\/td>\n<\/tr>\n<tr>\n<td>SRA 12<\/td>\n<td>141<\/td>\n<td>218<\/td>\n<td>14<\/td>\n<td>232<\/td>\n<\/tr>\n<tr>\n<td>SRA 13<\/td>\n<td>51<\/td>\n<td>68<\/td>\n<td>\u2013<\/td>\n<td>68<\/td>\n<\/tr>\n<tr>\n<td>SRA 14<\/td>\n<td>137<\/td>\n<td>232<\/td>\n<td>\u2013<\/td>\n<td>232<\/td>\n<\/tr>\n<tr>\n<td>TOTAL<\/td>\n<td>3.754<\/td>\n<td>6.600<\/td>\n<td>5.758<\/td>\n<td>12.358<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>1 Does not include Lobbies, circulation spaces, stairs, mechanical rooms, electrical rooms, servers and walls.<br \/>\n2\u00a0Includes all indoor areas.<br \/>\n3\u00a0Includes all open-air covered areas.<br \/>\n4 It is the total of the Gross Building Area plus the Semi open-air spaces Area.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Project Construction<\/strong><\/p>\n<p>Construction works for the overall complex began in December 2000 and were completed progressively from January 2003 until February 2004.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Project Cost<\/strong><\/p>\n<p>The cost for the construction works for the project, amounted approximately to \u20ac7.228.680 (\u039b\u039a 4.230.758,66) (excluding V.A.T.).<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Building Contractors<\/strong><\/p>\n<table width=\"500\">\n<tbody>\n<tr>\n<td>Main Contractor:<\/td>\n<td>A. N. Kyratzis &amp; Co LIMITED<\/td>\n<\/tr>\n<tr>\n<td>Electrical Subcontractor:<\/td>\n<td>A Eracleous Electrical Instalations\u00a0Ltd<\/td>\n<\/tr>\n<tr>\n<td>Mechanical Subcontractor:<\/td>\n<td>S Z Engineering\u00a0Ltd<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Planning \/ Design The planning and design of the Student Residences \u2013 Phase A (SRA) were the subject of the 2nd Architectural Design Competition, organised by<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":218,"featured_media":3392,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"no","_lmt_disable":"","footnotes":"","_links_to":"","_links_to_target":""},"categories":[90,76],"tags":[],"class_list":["post-3512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buildings","category-completed-projects"],"modified_by":"doxoula","publishpress_future_action":{"enabled":false,"date":"2026-06-21 14:07:14","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/posts\/3512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/users\/218"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/comments?post=3512"}],"version-history":[{"count":5,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/posts\/3512\/revisions"}],"predecessor-version":[{"id":5406,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/posts\/3512\/revisions\/5406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/media\/3392"}],"wp:attachment":[{"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/media?parent=3512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/categories?post=3512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ucy.ac.cy\/ts\/wp-json\/wp\/v2\/tags?post=3512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}